In this crypto podcast episode, Zypto Co-founder Joe Parkin interviews special guest Daria from Neon EVM.
Joe and Daria explore the basic concepts of EVM and take a deep dive into how Neon helps developers access the speed of Solana without having to learn a whole new set of tools. They also discuss various topics such as the future development of blockchain technology and the complications of gas on L2s.
Enjoy the podcast!
About Neon EVM
Neon EVM is a Layer 2 scaling solution built on the Solana blockchain that enables Ethereum-compatible smart contracts to run at high speed and low cost. By integrating the Ethereum Virtual Machine (EVM) with Solana’s fast and efficient infrastructure, Neon EVM allows developers to deploy their existing Ethereum-based dApps (decentralized applications) without needing to modify their codebase.
Bridging Ethereum Virtual Machine with Solana
This compatibility enables Ethereum developers to take advantage of Solana’s robust transaction throughput and lower gas fees, bridging the two ecosystems and bringing more liquidity and innovation to Solana. With the ability to process thousands of transactions per second, Neon EVM improves scalability and provides an enhanced user experience, making it a promising solution for both developers and users looking for more efficient blockchain interactions.
The project aims to create a smooth ecosystem where Ethereum dApps can enjoy the benefits of Solana’s high-performance network while preserving compatibility with Ethereum’s tools and infrastructure. By leveraging Solana’s consensus mechanism and transaction processing capabilities, Neon EVM offers faster finality and much lower fees compared to Ethereum’s mainnet.
Cross-Chain Interoperability
Additionally, the Neon EVM network introduces features like cross-chain interoperability and the ability to bridge assets between Solana and Ethereum-based networks, fostering greater collaboration across different blockchain platforms. As a result, Neon EVM has the potential to serve as a key player in the growing multi-chain world, improving both scalability and accessibility for decentralized applications.


Find out all about Neon EVM at neonevm.org
Looking For The Best Crypto Podcast?
Look no futher. Crypto Made Easy brings a host of incredible crypto projects and special guests from around the cryptosphere for the best in crypto education, research and entertainment.
Join the Zypto team and very special guests as we dive into the exciting world of crypto, web3, blockchain and decentralized finance.
We cover our guests’ fields of expertise, including everything from the most basic concepts and terminologies to our guests’ specific mission in the sector and the speakers’ own views.
Whether you’re a total newcomer or a seasoned expert, this crypto podcast is recorded in an easy-to-listen-to, conversational style that we’re sure you’ll love.
Crypto Made Easy by Zypto is recorded live in the @zyptoglobal Telegram group.
Catch Crypto Made Easy by Zypto on the Following Channels
| YouTube | Spotify |
| Amazon | iTunes |
| Castbox | Goodpods |
| iHeart Radio | Overcast |
| Pocketcasts | Pandora |
| Blubrry | Podchaser |
| Podcast Index | Deezer |






